- Brand矿山
- Country of manufactureChina
- 价格
Casting bridge crane double beam single trolley structure mainly consists of bridge, trolley cart running beam hook, and electrical parts, main hook fetching device is a fixed pitch hook beam used for lifting ladle and auxiliary hook matched to the main hook to complete the dumping of molten steel, slag and other auxiliary hoisting work.
A cart running mechanism and main electrical equipment are installed on the main girder, girder electrical room with rock wool insulation, equipped with air cooling machine. In order to reduce the heat radiation of the molten steel to the metal structure part, a heat insulating plate is arranged along the direction of the main beam at the bottom.
The structure of the cart is driven by four corners.
The crane is equipped with special electronic scales, in the cab and the bridge has the obvious display device, the main lifting mechanism is provided with overspeed switch